Proposed Protocols for Claims to Manufacturers Purpose This guide was developed by the Metal Building Contractors and Erectors Association...
Read PostBest Practices
Installation tips, Safety protocols, Quality control, and Common mistakes
As states or municipalities begin to adopt the new ASCE 7-22, it is worth noting that Chapter 32, “Tornado Loads” has now been completed...
Read PostWhenever I hear the term “pitfall,” I’m reminded of the 1980s video game where the hero swings over open alligator mouths,...
Read PostSelecting between factory-applied and field-applied caulking for IMPs requires weighing controlled manufacturing against on-site flexibility....
Read PostThe frustration of working with and trying to remove the protective wrapping that was factory installed on trims and Insulated Metal Panels and...
Read Post